Jabi Drainage Scheme
JABI, ABUJA | INFRASTRUCTURE | 4.5 KM NETWORK
Client
District infrastructure authority
Location
Jabi, Abuja
Scope
4.5 km network
Year
2022
OVERVIEW
About this project
Jabi flooded every rainy season, and every season the damage moved further up the catchment. The scheme replaced a fragmented network of undersized open drains with 4.5 kilometres of engineered reinforced concrete channels, sized from a hydrological model of the full catchment rather than the failed sections alone.
The work ran through occupied streets. Excavations were opened, lined, and closed in short sections — typically eighty metres at a time — so that no resident lost access to their property for more than a working day. Precast units were used where services congestion made in-situ pours impractical.
The network discharged its first full wet season without a single overtopping event. Maintenance access points were built into the design at every junction, because a drain that cannot be cleaned is a drain that will fail.
Services applied
NEXT PROJECT